Get a comprehensive breakdown on which materials to use what to take into consideration and what steps to take for four subfloor systems.
Plywood over concrete for hardwood.
I don t remember what it is called but it comes in a roll 6 ft by 50 ft.
Before hardwood flooring is installed over concrete a plywood subfloor must be installed.
Glue down engineered hardwoods can be glued note.
Float this is when the hardwood is clicked into each other or glued at joints but is not attached to the floor.
Learn how to install beautiful hardwood floors over a concrete slab.
Install the plywood after the vapor retarder is in place.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Not all subfloors are the same.
It looks like a sheet of dimples or very large bubble wrap.
Concrete has moisture in it and your wood will mold and rot over time.
It lays directly on top of the waterproof barrier or combination of barrier and underlayment to help cushion and insulate.
Once you ve installed a vapor retarder install your subfloor.
Cut plywood to fit within 1 8 near door jambs and other obstructions where finish trim will not be used.
Floated subfloor alternate subfloor glue down sub floor and the nail down subfloor system.
Often when we talk of subflooring people think of lauan plywood which is used as subflooring over thicker plywood in preparation for installing a vinyl floor.
1 nail down requires plywood sub flloor you can t nail into concrete last i checked 2.
Installation over concrete with a calcium carbide reading of greater than 2 5 percent.
Solid hardwood can not be glued except for bamboo 3.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Do not use pressure treated plywood unless it has been kiln dried after treatment kdat and moisture content coincides with the in use environment of the facility in which the flooring is being installed.
Loosely lay a nailing surface of 3 4 4 x 8 exterior plywood panels over the entire area leaving a 3 4 space at the wall line and 1 4 to 1 2 between panels.
To install a floated subfloor system first place a layer of plywood subfloor panels with the edges parallel to the wall.
A moisture control membrane is recommended any time a wood subfloor is installed over concrete.
Don t glue the plywood to the concrete.